Park/Trail/Sidewalk Improvement Projects

101ST STREET (ELM STREET TO BARKWEST TRAIL)

UPDATE (05/30/2023) - Paving of asphalt is complete. Landscaping and fence replacement should begin this week.


121ST STREET TRAIL (ELM TO ELWOOD)

UPDATE (06/20/2023) - Staff is going through the design consultant selection process.


PEDESTRIAN BRIDGE INSPECTION

UPDATE (06/20/2023) - 

Concerning the Bridge Inspection Report:

o The consultant is reviewing inspection data and photos, the draft report is in-progress, the draft report is preparing for the first round of quality control review.

• Concerning the Load Rating Analysis:

o The Base/Design As built with current dead loads model is complete, the first round of quality control on the base model is underway.

• The draft inspection report is due in June, the load rating analysis is due in September and the final bridge inspection report is due in October.